EKECONSTRUCTNIGERIA
2
Ekeconstruct Nigeria Structural Engineering Landmark

Engineering at it's finest.

Section 01 • Ready-to-Build Designs & Material Counts

Explore Ekeconstruct Nigeria Building Plans

Every house plan includes full architectural drawings, COREN structural calculations, and honest counts for 50kg cement bags, blocks, and iron rods.

View Full Structural Catalog (9 Plans)
Select Building & Structural Category (All Categories Visible):
The Sovereign Crest 6-Bedroom Triplex Mansion Structure
PLAN: EKC-STR-001Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 285,000,000

Full Breakdown
Triplex Villa Structure (G + 2 Floors + Penthouse)COREN Approved
The Sovereign Crest 6-Bedroom Triplex Mansion Structure

A state-of-the-art 3-storey reinforced concrete residential structure engineered with a 3.8m dramatic front cantilever, double-height void over the main ante-room, reinforced concrete lift shaft for a residential glass elevator, infinity pool structural shell, and 3-room detached BQ.

01. CEMENT & BLOCKS4,250 Bags • 28,500 Blks
02. IRON RODS (STEEL)64.5 Tonnes Rods
03. RECOMMENDED LANDMin. 900 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Raft Foundation
6 Beds • 920m² Floor
40 – 48 Weeks (10–12 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦3.8M
View PlanWhatsApp
The Aurelia 5-Bedroom Contemporary Cantilevered Duplex Plan
PLAN: EKC-STR-002Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 145,000,000

Full Breakdown
Detached Duplex Structure (G + 1 Floor)COREN Approved
The Aurelia 5-Bedroom Contemporary Cantilevered Duplex Plan

Our most popular 5-bedroom detached duplex structure designed to fit a standard 500–600 sqm plot with ample parking for 5 cars, a 2-room attached BQ, floating reinforced concrete staircase, floor-to-ceiling thermal glass panels, and hidden RC roof gutter slab.

01. CEMENT & BLOCKS2,350 Bags • 15,800 Blks
02. IRON RODS (STEEL)29.8 Tonnes Rods
03. RECOMMENDED LANDMin. 500 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Pad & Strip Footings
5 Beds • 480m² Floor
28 – 36 Weeks (7–9 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦2.2M
View PlanWhatsApp
Concordia 8-Unit Multi-Storey Apartment Block (G + 3 Floors)
PLAN: EKC-STR-003Multi-Storey Apartment Blocks

Full Move-In Cost (Painted & Tiled)

NGN 420,000,000

Full Breakdown
4-Storey Block of Flats (8 × 3-Bedroom Apartments)COREN Approved
Concordia 8-Unit Multi-Storey Apartment Block (G + 3 Floors)

A high-density, structurally robust 4-storey residential block comprising eight (8) spacious 3-bedroom apartments (2 flats per floor), central passenger elevator core, dual fire-rated escape staircases, and ground-level parking bays.

01. CEMENT & BLOCKS7,600 Bags • 48,000 Blks
02. IRON RODS (STEEL)118.0 Tonnes Rods
03. RECOMMENDED LANDMin. 1000 sqm Plot
04. FOUNDATION TYPECellular Reinforced Concrete Raft Foundation
24 Beds • 1680m² Floor
48 – 60 Weeks (12–15 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦5.5M
View PlanWhatsApp
Emerald Atrium 6-Storey Grade-A Commercial Office Structure
PLAN: EKC-STR-004Commercial & Office Structures

Full Move-In Cost (Painted & Tiled)

NGN 780,000,000

Full Breakdown
6-Storey Commercial Office Building (Column-Free Floor Plates)COREN Approved
Emerald Atrium 6-Storey Grade-A Commercial Office Structure

A state-of-the-art 6-storey commercial office structure engineered with 9.0m × 9.0m wide-span ribbed waffle slabs to deliver open, column-free corporate floor plates, structural curtain-wall glazing anchors, twin elevator shafts, and basement/ground parking.

01. CEMENT & BLOCKS13,200 Bags • 22,000 Blks
02. IRON RODS (STEEL)235.0 Tonnes Rods
03. RECOMMENDED LANDMin. 1500 sqm Plot
04. FOUNDATION TYPEDeep Bored Concrete Piles
2850m² Floor
60 – 76 Weeks (15–18 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦9.5M
View PlanWhatsApp
Greenhaven 4-Bedroom Contemporary Winged Bungalow Plan
PLAN: EKC-STR-005Bungalow & Family Structures

Full Move-In Cost (Painted & Tiled)

NGN 58,000,000

Full Breakdown
High-Headroom Contemporary Bungalow (3.6m Ceiling + Parapet)COREN Approved
Greenhaven 4-Bedroom Contemporary Winged Bungalow Plan

Designed with the bold visual presence of a duplex while maintaining single-storey accessibility and cost efficiency. Features a 750mm elevated damp-proof plinth, 3.6m internal ceiling height, cast-in-situ RC roof fascia parapet, and 4 en-suite bedrooms.

01. CEMENT & BLOCKS1,120 Bags • 7,400 Blks
02. IRON RODS (STEEL)8.4 Tonnes Rods
03. RECOMMENDED LANDMin. 450 sqm Plot
04. FOUNDATION TYPE675mm Wide Reinforced Concrete Strip Foundation at 1.2m Depth + Pad Bases under Verandah Columns
4 Beds • 245m² Floor
14 – 18 Weeks (3.5–4.5 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦950K
View PlanWhatsApp
TitanSpan 2,400 SQM Structural Steel Portal Frame Warehouse & Office
PLAN: EKC-STR-006Industrial & Steel Structures

Full Move-In Cost (Painted & Tiled)

NGN 540,000,000

Full Breakdown
Clear-Span Industrial Warehouse + 2-Storey RC Admin BlockCOREN Approved
TitanSpan 2,400 SQM Structural Steel Portal Frame Warehouse & Office

Heavy-duty 30m clear-span × 80m long structural steel portal frame warehouse and factory facility with a 2-storey reinforced concrete administrative office annex, overhead crane corbel provision (10-Tonne Gantry capacity), and laser-screeded fibre-reinforced industrial floor slab.

01. CEMENT & BLOCKS6,400 Bags • 14,500 Blks
02. IRON RODS (STEEL)142.0 Tonnes Rods
03. RECOMMENDED LANDMin. 4000 sqm Plot
04. FOUNDATION TYPEHeavy-Duty Reinforced Concrete Pad Footings
2400m² Floor
32 – 40 Weeks (8–10 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦6.8M
View PlanWhatsApp
The Kensington 4-Bedroom Twin Semi-Detached Duplex Structure
PLAN: EKC-STR-007Duplex & Villa Structures

Full Move-In Cost (Painted & Tiled)

NGN 185,000,000

Full Breakdown
Semi-Detached Twin Duplex (2 Mirror Units × 4-Bedrooms)COREN Approved
The Kensington 4-Bedroom Twin Semi-Detached Duplex Structure

Engineered for landowners and family builders who want two independent 4-bedroom luxury duplexes on a single plot. Features an acoustic double-leaf structural party wall, independent foundation tie beams, separate gate entrances, and 2 en-suite BQs.

01. CEMENT & BLOCKS3,100 Bags • 21,400 Blks
02. IRON RODS (STEEL)41.5 Tonnes Rods
03. RECOMMENDED LANDMin. 700 sqm Plot
04. FOUNDATION TYPECombined Pad & Strip Foundation with Central Eccentricity Strap Beams
8 Beds • 680m² Floor
32 – 40 Weeks (8–10 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦2.8M
View PlanWhatsApp
MedCore 50-Bed Specialist Hospital & Diagnostic Center Structure
PLAN: EKC-STR-008Commercial & Office Structures

Full Move-In Cost (Painted & Tiled)

NGN 520,000,000

Full Breakdown
3-Storey Healthcare & Medical Facility StructureCOREN Approved
MedCore 50-Bed Specialist Hospital & Diagnostic Center Structure

Purpose-engineered 3-storey medical and diagnostic complex featuring high-density concrete radiation shielding for CT/X-Ray rooms, vibration-isolated surgical theatre slabs, wide hospital stretcher elevator core, and structural emergency ramp.

01. CEMENT & BLOCKS8,800 Bags • 34,000 Blks
02. IRON RODS (STEEL)136.0 Tonnes Rods
03. RECOMMENDED LANDMin. 1800 sqm Plot
04. FOUNDATION TYPEReinforced Concrete Raft Foundation
50 Beds • 1950m² Floor
48 – 60 Weeks (12–15 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦7.5M
View PlanWhatsApp
Estate Civil Infrastructure Package: 1.5km Road, RC Box Culverts & Retaining Wall
PLAN: EKC-STR-009Civil Infrastructure & Bridges

Full Move-In Cost (Painted & Tiled)

NGN 310,000,000

Full Breakdown
Civil Engineering Infrastructure Package (Per Kilometer / Estate)COREN Approved
Estate Civil Infrastructure Package: 1.5km Road, RC Box Culverts & Retaining Wall

Complete civil engineering infrastructure execution for residential estates, industrial parks, and access roads. Includes topographic survey, earthworks grading, twin cast-in-situ reinforced concrete U-drains, double-cell RC box culverts, cantilevered retaining walls, and 50mm hot-rolled asphalt or 80mm interlocking stone pavement.

01. CEMENT & BLOCKS8,400 Bags • Precast Blks
02. IRON RODS (STEEL)88.0 Tonnes Rods
03. RECOMMENDED LANDMin. 50000 sqm Plot
04. FOUNDATION TYPE150mm Compacted Lateritic Sub-Base
15000m² Floor
20 – 28 Weeks (5–7 Months)
Pay Stage-by-Stage (5 Phases)Drawings + BOQ: ₦4.5M
View PlanWhatsApp
Section 02 • Certified Nigerian Building & Engineering Team

Connect With All 8 Ekeconstruct Building Specialists

Avoid site mistakes, collapsed foundations, or inflated material quotes. Click any of our 8 certified Nigerian specialists below to inspect their Main Covering, Technical Specifications, and connect directly for your project.

Professional Bodies

COREN • ARCON • NIQS

In-House Units

8 Verified Disciplines

Your Connections

1 Active

Civil and Structural Engineers Inspecting Site Blueprints and Steel Formwork
EKECONSTRUCT NIGERIA • SITE & BLUEPRINT VERIFICATIONCOREN / ARCON / SURCON / NIQS

Direct supervision from soil test and foundation setting-out to final MEP testing and handover.

01 • COREN Structural Lead

Civil & Structural Engineer

Engr. Chibuike Ekeson, FNSE

Makes sure your building never cracks, tilts, or collapses. Calculates the exact thickness of your foundation, pillars (columns), beams, and upstairs decking so your house stands strong for 50+ years.

Connected
02 • ARCON Principal Architect

Architect

Arc. Adaeze Nwosu, MNIA

Designs how your house looks inside and outside. Plans the room sizes, living room flow, cross-ventilation for Nigerian weather, parking space on your plot, and produces 3D realistic photos before a single block is laid.

6 Main Coverings
03 • SURCON Registered Surveyor

Land Surveyor

Surv. Babatunde Ogunleye, FNIS

Verifies that the land you want to buy is free from Government acquisition (road/pipeline setback), plants concrete beacon pillars on your exact boundaries, and sets out the exact building lines so your house is straight and legal.

6 Main Coverings
04 • Soil Test & Piling Specialist

Geotechnical Engineer / Soil Investigation Specialist

Engr. Dr. Tamuno Briggs, MNSE

Tests the soil deep under your land before you build so you know whether normal Strip foundation is safe or if you need a Raft or Pile foundation. Prevents sinking houses, tilted walls, and wasted foundation money.

6 Main Coverings
05 • NIQS / QSRBN Cost Specialist

Quantity Surveyor (QS)

QS. Oluwaseun Adeyemi, MNIQS

The building cost accountant who protects your money from contractor cheating. Counts the exact number of 50kg bags of cement, 9-inch blocks, lengths of iron rods, sand, granite, tiles, and labour cost needed for every stage of your building.

6 Main Coverings
06 • CORBON Turnkey Site Builder

Building Contractor

Bldr. Emeka Okafor, MNIOB

Manages the actual physical building of your house on site — from clearing the bush, digging the foundation, molding/buying vibrated blocks, casting the German floor and decking, roofing, plastering, tiling, and handing you the keys.

6 Main Coverings
07 • COREN / NEMSA Electrical Pro

Electrical Engineer / Qualified Electrical Installer

Engr. Yusuf Danjuma, MNSE (NEMSA Certified)

Handles all electrical pipes inside the decking and walls, pure copper wiring, distribution boards, AC points, change-over switches, solar/inverter hybrid integration, and thunder/lightning earthing so your house is 100% safe from fire or shock.

6 Main Coverings
08 • PPR Piping & Water Systems Pro

Plumbing Professional & Mechanical Specialist

Engr. Kingsley Udoh & Master Plumbing Team

Installs leak-proof hot and cold water pipes, bathroom drainage, borehole drilling and iron-water treatment plants, overhead tank scaffolding, and modern odorless biodigester sewage systems so your walls never get damp or smelly.

6 Main Coverings
COREN Structural LeadAvailable for Site & Blueprint ReviewCOREN Reg. #R.28491 • FNSE • M.IStructE

Civil & Structural Engineer — Engr. Chibuike Ekeson, FNSE

Makes sure your building never cracks, tilts, or collapses. Calculates the exact thickness of your foundation, pillars (columns), beams, and upstairs decking so your house stands strong for 50+ years.

Open in Dashboard

Main Covering & Site Responsibilities

Click any scope below to connect
1

Foundation Engineering (Pad & Strip Footings, Cellular Raft Foundations & Bored Pile Foundations)

2

Reinforced Concrete Pillar (Column), Transfer Beam & Upstairs Decking (Slab) Design

3

Complete Iron Rod Bar Bending Schedule (BBS) — specifying exact Y10, Y12, Y16, Y20 & Y25 rod sizes

4

COREN Official Stamped Structural Calculation Sheets for Town Planning Building Approval

5

Non-Destructive Structural Integrity Testing (Schmidt Hammer & Ultrasonic Pulse) for uncompleted buildings

6

Estate Road Pavement, Reinforced Concrete Box Culverts, Retaining Walls & Flood Drainage Channels

Technical Specifications & Standards

Design Codes & Standards

BS 8110-1:1997, Eurocode 2 (EN 1992-1-1) & Eurocode 3 (Steelwork)

Concrete Grade Specification

C25/30, C30/37 & C35/45 verified by 7-day and 28-day lab cube crushing tests

Reinforcement Steel Spec

High-Yield Thermo-Mechanically Treated (TMT) Deformed Bars (fy = 500 N/mm²)

Software & Analysis Tools

ProtaStructure, Orion, ETABS, SAFE & AutoCAD Structural Detailing

Key Deliverables to Client

Stamped Structural Working Drawings + Calculation Report + Bar Bending Schedule + Cube Test Log

Stage Needed:Stage 01–04 (Before Digging Foundation up to Roof Beam)
18+ Years Across 36 States & FCT
Section 03 • Transparent Naira Building Cost Estimator

Calculate Your Building Budget & 5-Stage Payment Plan

Compare how much it costs to build to Carcass (Roofed Shell) versus Full Move-In Finish, including exact cement bags, blocks, and iron rods.

+8%
0% (Fixed Contract)8% Recommended20% High Buffer
ESTIMATED TOTAL BUILDING BUDGET

NGN 307,800,000

For The Sovereign Crest 6-Bedroom Triplex Mansion Structure • Full Move-In Standard Finish (Turnkey)

Cement (50kg)

4,250 Bags (42.5N Grade)

Sandcrete Blocks

28,500 Units (9-Inch Vibrated)

Iron Rods (Steel)

64.5 Tonnes (Y10 – Y32 TMT)

Granite Aggregate

690 Tonnes (19mm & 12mm)

PAY-STAGE-BY-STAGE SCHEDULE (NEVER PAY 100% UPFRONT)

1

01. Substructure, Excavation & Raft/Pad Foundation

Site clearing, setting out, blinding, Y16/Y20 raft reinforcement, C35/45 concrete pour, hardcore & DPC slab.

NGN 55,404,000

18% of budget

2

02. Ground, 1st & 2nd Floor RC Columns, Beams & Slabs

Formwork, steel fixing, lift core shear walls, cantilevered transfer beams, staircases & 200mm suspended slabs.

NGN 83,106,000

27% of budget

3

03. Blockwork, Lintels, Parapet & Roof Structure

9-inch vibrated block walls, ring beams, cast-in-situ RC parapet gutter, steel trusses & roofing sheets.

NGN 43,092,000

14% of budget

4

04. First & Second Fix MEP (Electrical, Plumbing, HVAC)

Conduits, armoured cabling, PPR pressure pipes, biodigester, VRF AC piping & solar-inverter microgrid.

NGN 49,248,000

16% of budget

5

05. Plastering, Screeding, Glazing & Turnkey Finishes

Internal/external rendering, double-glazed curtain walls, porcelain/marble tiling, joinery & external paving.

NGN 76,950,000

25% of budget

Section 04 • Current Nigerian Building Material Rates

Today’s Verified Market Price Guide

Value Your Personal Design With Current Rates
Cement & BindersNGN 9,500 / Per 50kg Bag

42.5N / 52.5R Portland Limestone Cement (Dangote / BUA / Lafarge)

Structural RC Frames, Slabs, Footings & Blockwork Mortar

High-Yield ReinforcementNGN 1,380,000 / Per Metric Tonne

High-Yield TMT Deformed Steel Rebar (Y12 / Y16 — fy = 500 N/mm²)

Two-Way Suspended Slabs, Stirrups, Secondary Beams & Lintels

High-Yield ReinforcementNGN 1,420,000 / Per Metric Tonne

Heavy Structural TMT Steel Rebar (Y20 / Y25 / Y32 — fy = 500 N/mm²)

Raft Foundations, Pile Cages, Columns & Cantilever Transfer Beams

Ready-Mix ConcreteNGN 165,000 / Per Cubic Meter (m³)

C30/37 – C35/45 Batch-Plant Ready-Mix Structural Concrete (Pumped)

Monolithic Raft Pours, Suspended Waffle Decks & High-Rise Cores

Coarse AggregatesNGN 690,000 / Per 30-Tonne Trip

Crushed Igneous Granite Aggregate (12mm / 19mm Graded)

High-Strength Structural Concrete Mixing & Road Stone Base

Structural MasonryNGN 1,150 / Per Unit Block

225mm (9-Inch) Hydraulically Vibrated Hollow Sandcrete Block (≥3.5 N/mm²)

External Load-Relieved Walls, Acoustic Partitions & Foundation Walls

Active & Completed Ekeconstruct Nigeria Sites

Real structural works supervised by our COREN and ARCON field teams across Nigeria.

Guzape Hills Cantilevered Triplex Villas & Stepped Retaining Wall Works
Hillside Structural Engineering & Turnkey Build78% Complete

Guzape Hills District, Abuja FCT • Q1 2027 Structural & Turnkey Handover

Guzape Hills Cantilevered Triplex Villas & Stepped Retaining Wall Works

6.5m High Counterfort RC Retaining Wall + C35/45 Rock-Anchored Pad Foundations

Contract Value: NGN 285,000,000
Atlantic Crest 10-Storey RC Frame & Deep Pile Foundation Project
High-Rise Piling & Structural Frame52% Complete

Victoria Island / Lekki Foreshore Corridor, Lagos • Q4 2027 Completion

Atlantic Crest 10-Storey RC Frame & Deep Pile Foundation Project

84 × 600mm Ø Bored Friction Piles to 28m + 1.5m Thick C40/50 Pile Caps

Contract Value: NGN 780,000,000
Sagamu Interchange 3,000 SQM Structural Steel Logistics Hub
Structural Steel Portal Frame & Industrial Civil Works85% Complete

Sagamu-Abeokuta Industrial Axis, Ogun State • Q1 2027 Handover

Sagamu Interchange 3,000 SQM Structural Steel Logistics Hub

32m Clear-Span S355JR Universal Beam Portal Frame + 225mm Fibre-Reinforced Floor

Contract Value: NGN 540,000,000
The Emerald Court 5-Bedroom Duplex Cluster & Estate Civil Works
Turnkey Residential Construction100% Complete

Independence Layout, Enugu & New GRA, Port Harcourt • Completed Ahead of Schedule

The Emerald Court 5-Bedroom Duplex Cluster & Estate Civil Works

C30/37 Monolithic RC Frame + 80mm Interlocked Estate Road & Box Culvert

Contract Value: NGN 145,000,000
Section 05 • Step-by-Step Construction Process

How Ekeconstruct Nigeria Builds Your House From Soil Test to Key Handover

Whether you live in Nigeria or in the Diaspora (UK, USA, Canada, Europe), every stage is inspected, photographed, and signed off before you fund the next milestone.

01Pick or Upload

Pick a House Plan or Submit Your Personal Design

Choose a ready-made house plan from our catalog OR upload your own personal architectural drawing in your User Dashboard for instant cost valuation.

✓ Instant Cost Estimate & Material List
02Land & Soil Check

Land Inspection & Soil Test (Dry vs Swampy Land)

We inspect your plot of land and test the soil so we know whether your land needs a standard Strip foundation, Raft foundation, or Pile foundation.

✓ Official Soil Test & Foundation Report
03Drawings & List

Stamped Drawings & Honest Material List (BOQ)

We give you COREN-stamped building drawings and a clear Material List showing the exact bags of cement, blocks, iron rods, and sand needed for each stage.

✓ Stamped Drawings & Full Material List
04Foundation (DPC)

Digging, Foundation & German Floor (DPC Stage)

Clearing the land, digging trenches, tying iron rods, pouring foundation concrete, filling with laterite/hardcore, and casting a damp-proof German floor.

✓ Solid Foundation & German Floor (DPC)
Picked Plan EKC-STR-002 • Turnkey Build★★★★★

“I picked the 5-Bedroom Aurelia Duplex Plan on Ekesonconstruct while living in Manchester. Engr. Ekeson’s team conducted the soil test on my Enugu land, shared the exact BOQ down to every bag of cement and tonne of Y16 rod, and built the structure to turnkey perfection with bi-weekly drone videos.”

Dr. Obinna & Mrs. Chisom Nwachukwu

Diaspora Landowners • Manchester, UK & Enugu

Deep Foundation & 4-Storey RC Frame★★★★★

“Our Lekki plot had poor swampy soil that scared two previous contractors. Ekesonconstruct ran a 30m CPT geotechnical test, engineered a 1,100mm cellular raft foundation with C35/45 concrete, and delivered our 4-storey apartment block with zero settlement.”

Engr. Tunde Bakare

Operations Director, Atlantic Energy Logistics • Lagos

Ekeconstruct Nigeria Workspace

Ready to Plan or Value Your Building Project?

Open your personal User Dashboard to save houses, upload your architect’s drawing for Naira valuation, or access the Admin Dashboard for full platform management.